Reinstalling the Leffel 21-Z Runner
21 Z runner with new coupling adapter
Lowering the runner into the pit with the excavator
Hoisting runner using ramps. Note wicket gates to left and the remainder of the turbine housing to the right
Hydro power is muddy work